Successfully implemented projects are what ultimately counts. PORR Umwelttechnik can look back on almost three decades of experience and hundreds of successfully completed orders. We work for a variety of employers in the construction industry. Public institutions rely on our expertise, as do industrial, commercial and private customers.

Our expertise and holistic approach, state-of-the-art technology and the high personal commitment of our employees are behind every one of our successfully completed projects. Here is a small selection of them. See for yourself.

Decontamination at Penzinger Strasse 76

Photo: two skilled workers equipped with protective suits, rubber boots, gloves and respiratory masks with two wheelbarrows full of wooden blocks; more piles of wooden blocks in the foreground and background
Facts and Figures
Company PORR Umwelttechnik GmbH in ARGE
PrincipalPrajo & Co GmbH
LocationVienna - Austria
Type Decontamination and asbestos remediation
Runtime03.2016 - 04.2017

Decontamination of a polluted industrial site.

The Penzinger Strasse 76 project is a former industrial site. PORR Umwelttechnik was awarded the contract for the decontamination of several buildings. These were constructed at different times and served a variety of purposes during their period of use. For example, some of the workshops and halls were later adapted to house offices. However, various building materials used at the time of construction are now regarded as toxic or as constituting a health risk. The goal of this decontamination work was to prepare the buildings for demolition approval.

The removal of hazardous substances from the buildings was, for the most part, carried out in seven main remediation zones.

Four zones covered the removal of the sprayed asbestos coatings from the façades of the newer buildings, while another three involved removing the floors containing PAH in the older buildings. Over a period of around twelve months, the team of specialists at PORR Umwelttechnik removed building materials containing harmful substances from around 5,700m² of façade and roughly 5,400m² of floor area. This allowed the buildings to be demolished safely